ϟ TerraHash Energy

TerraHash Energy

2017 Milestone Review: Climate Action Plan 2030+, Renewable Grid Readiness & Waste-to-Energy Infrastructure in Hong Kong

2017 Strategic Overview in Hong Kong

In 2017, the HKSAR Environment Bureau unveiled the landmark Hong Kong’s Climate Action Plan 2030+. TerraHash Energy aligned its technical strategy with the government's ambitious carbon reduction targets, deploying grid-readiness software for distributed renewables, smart metering analytics, and waste-to-energy integration across Hong Kong.

2017 Hong Kong Regional Development Blueprint

Hong Kong Climate Action Plan 2030+

Hong Kong Climate Action Plan 2030+

  • 2030 Reduction Target: Reduce absolute carbon emissions by 26-36% compared to 2005.
  • SCA Signing: New 15-year Scheme of Control Agreements signed with CLP and HEC.
Lantau Solar Panels and Grid

Lantau & Distributed Solar Integration

  • FiT Framework Readiness: Preparing grid telemetry for rooftop solar feed-in tariff.
  • Shek Pik Reservoir Solar: Testing Hong Kong's first floating PV array performance.
Waste to Energy Infrastructure

Siu Ho Wan Bioenergy Hub (O-PARK1)

  • Organic Resources Recovery: Construction completion of Hong Kong's first anaerobic digestion facility.
  • Biogas to Power: Converting food waste into grid-synchronized electricity.

2017 TerraHash Development Timeline

January 2017

Climate Action 2030+ Strategy Alignment

Published the 2030 Decarbonization Technical Whitepaper, supporting building efficiency standards and renewable forecasting tools.

Location: HKSAR Policy Framework Roadmap
June 2017

Distributed FiT Grid Gateways Pilot (Lantau & New Territories)

Developed smart edge gateways designed to measure micro-generation output and report bi-directional power flow ahead of the 2018 FiT launch.

Location: Lantau Solar Pilots & Shek Pik Reservoir
November 2017

Biogas Power Generation Monitoring System (O-PARK1)

Deployed custom SCADA analytics for the Siu Ho Wan Organic Resources Recovery Centre to monitor biogas turbine efficiency and grid export stability.

Location: Siu Ho Wan, North Lantau